BIM services

4D and 5D (VDC)

The model linked to time and cost, so planning, estimating and site teams work from the same data.

4D5DRevit
Infrastructure model of a flyover used for 4D sequencing

We link the model to time and cost, so planning, estimating and site teams work from the same data and see the effect of a change before it reaches site.

Quantities come straight from the model elements, so each line in the bill can be checked against something you can see. When the design changes, the take off is updated from the same model rather than re-measured by hand.

We connect the construction programme to the model so the team can watch the build sequence, find clashes in time as well as in space, and review progress against the plan at each stage.

4D · Time and 5D · Cost

  • Programme linked to model elements
  • Construction sequence simulations
  • Progress reviews against the model
  • Model based quantity take off
  • Quantities mapped to your BOQ
  • Bid stage estimates and MTO

Related projects

Infrastructure layout model of a flyover

Infrastructure · 4D sequencing

Flyover

Infrastructure model used for 4D construction sequencing.

View project

Get a quote

Send your drawings. Get an approach and a quote back.

Tell us about the structure, the code and your dates. A senior engineer reads every enquiry.